Sample Report

Reporting that gives maintenance teams something they can actually act on.

A redacted report sample will be added once approved field examples are available. For now, the site explains the report structure and severity approach without publishing any real client data.

Executive summary with facility, date, and scope notes
Thermal image paired with matching visual image
Asset location, equipment name, and observed condition
Severity and recommended next action
Repair verification or rescan section when follow-up is performed

Visible Image Placeholder

Thermal Image Placeholder

Asset ID: SWGR-1B-04Priority 2 - Serious

Main disconnect termination

Main switchgear room, service entrance line-up

Observed Condition
Noticeable hotspot at one termination compared with adjacent comparable points.
Temperature Delta
29F above adjacent connection
Probable Cause
Possible loose connection or increasing resistance under load.
Recommended Action
Review and repair by qualified electrical personnel at the next safe maintenance opportunity.
Follow-up Needed
Rescan after corrective work

Risk Priority Matrix

Priority 1

Critical

Immediate safety, fire, shutdown, or equipment failure concern.

Priority 2

Serious

Repair should be scheduled promptly.

Priority 3

Monitor

Abnormal condition; recheck under operating load or during next inspection cycle.

Priority 4

Baseline

No actionable anomaly observed; retain as reference record.

Request an Inspection

Build a repeatable infrared inspection program around your highest-risk electrical assets.

Start with a facility scan, align around safe access and operating conditions, and turn findings into planned maintenance follow-up instead of surprise downtime and emergency reaction work.